Chongqing International Construction Corporation

Build an excellent international construction service provider

GROUP BUSINESS

Engineering contracting

Brief introduction of engineering contracting business

Chongqing International Construction Corporation has 3 qualifications of Chinese Foreign Aid Whole-Set Projects, Foreign Aid Project General Contracting and Foreign Technical Assistance Project Implementation. It has obtained general contracting qualifications such as Special Grade in Building Construction, Class A in Design and First Grade in Municipal Construction and class A qualifications of supervision in municipal , housing construction, highway and a series of other professional qualifications. CICO has formed a relatively complete industrial chain integrating design, construction, supervision, test and inspection, installation, and fit-out. The Group is committed to building an "excellent transnational building service provider", actively participating in the "Belt and Road" Initiative, the development of the western region, the construction of the Chengdu-Chongqing "dual city" economic circle, and the construction of Chongqing inland open heights. It has accumulated more than 200 overseas projects. Implemented 48 Chinese foreign aid projects, undertook nearly 300 domestic projects, and many projects won national and local quality engineering awards.

Representing Projects
Aid Project of Presidential Palaces of African country

The project is an economic aid project of the Ministry of Commerce of China, with a construction area of 18670.53 square meters and a building height of 19.2 meters.

The construction of Monrovia Bay Bridge Project in Liberia.

The project is located in Monrovia, the capital of Liberia, Africa. It is loaned by the World Bank. The construction content of the project is to demolish the damaged steel structure bridge and build a new concrete structure bridge on the original site. The new bridge adopts the post-tensioned pre-stressed cantilever construction method. The bridge is a single-cell structure with straight webs. The deck is 13.5 meters wide and 240 meters long, divided into three spans. Two of the side spans are 70 meters, the middle span is 100 meters, and the foundation is 24 bored piles. Contract commencement date: December 26, 2008; completion date: December 26, 2011. After the project is completed, it will connect the two sides of the bay and will be the city's transportation hub project.

Aid Project in Liberia - Ebola Diagnosis and Treatment Center Project.

Economic assistance project of the Ministry of Commerce of China. Building area: 3717.53 square meters, construction period of 24 days. The construction of the 3,700 square meters core area of the Liberia Ebola diagnosis and treatment center was completed with high quality in just over 28 days. It was praised by Africa as "Chinese Standard, China Speed", was jointly commended by seven national ministries and commissions, and was highly praised by WHO and the Liberian government .

Upgrading of FORT POTAL - BUNDIBUGYO - LAMIA Road Project in Uganda.

The project is 220 kilometers away from the capital. The starting point is on the outskirts of Hoima, across the administrative provinces of Hoima and Buliisa, connecting the towns of Biiso and Butiaba, and ending at Wanseko. The main line of the project is about 106 kilometers long, and the urban roads are about 4 kilometers long, a total of 111 kilometers. The road is an important transportation channel for the construction of local oil resources in Hoima and Bulisa, and plays an important role in the economic construction of the region and Uganda. From the starting point to 38km, there are hills and undulating areas intertwined with swamps and rivers. After a mountain section of about 5 kilometers, the terrain is flat and ends at the port of Wanseko. The project is (20-25cm thick machine crushed stone subbase (CRS) + 20cm thick machine crushed stone base (CRR) + 5cm asphalt concrete pavement (AC20) + 2 single-span simply supported beams). The project is funded by the Export-Import Bank of China, the employer is the Uganda Highway Bureau, and the construction period is 36 months.

Upgrading of Lodwar - Nadapal Road Lot 2: Upgrading of Lokitaung Junction (JN A1/C47) - Kalobeiyei R

The project is located in northern Kenya, close to the border with South Sudan, and is part of the project for the development of transportation and trade between Kenya and Uganda and South Sudan. The entire section of the highway is 240km in length, designed as two-way two-lane, divided into three bid sections. This project is the second tender section, namely LOT2. The starting point is 80km away from the border at Kerobeye, and the end point of the project is Rocky Town via Kakuma Town. The length of the route is 80km. The main road is 11m wide (the driving lane is 3.5m, the shoulder is 2m), the urban road is 30m wide, 149 box pipe culverts and 11 bridges. Funded by the World Bank, the employer is the Kenya National Highways Authority, and the construction period is 36 months.

坦桑尼亚85公里项目

The TABORA road construction project is located in the TABORA region of Tanzania, 847 kilometers from the capital Dar es Salaam. The construction section of the project is: TABORA-NYAHUA, with a total length of 85 kilometers, including 10 kilometers of newly built sections, located on the edge of TABORA city, and 75 kilometers of old road reconstruction. The original road was a 6-meter-wide dirt road, and the project was constructed into a 9.5-meter-wide double-surface asphalt road. The construction section is hilly and plain. There are hills, villages, farmland and shrubs on both sides of the road. The altitude is about 1260 meters. The climate is hot and dry. There is no river system around. The construction section belongs to severe water shortage area. In the rainy season, water is used for storage, and some wells are also used for drinking. The project is funded by the Tanzanian government, the employer is the Tanzania National Roads Agency (TANROADS), and the construction period is 36 months.

China Aid Musanze Technical School in Rwanda

The project is an economic aid project of the Ministry of Commerce of China, with a total construction area of about 7600 m2. The employer is the Agency fro International Economic Cooperation, Ministry of Commerce and the construction period is 18 months.

China Aid Baqa’a Hospital Project in Jordan

The project is an economic aid project of the Ministry of Commerce of China, with a total construction area of 11740 square meters, 100 beds, and a construction period of 16 months.

Rehabilitation/Reconstruction and Upgrading of Polder 39/2c, 40/2, 41/1, 43/2c, 47/2 and 48 under CE

The project is located in the Barisel region of southern Bangladesh. It is a seawall reconstruction and protection project and consists of six islands. The main works of this project include prefabrication and dumping of prefabricated blocks (approximately 480,000 cubic meters), accounting for 44% of the contract value; seawall earthwork (the total length of the seawall is 209 kilometers, and the earthwork volume is about 8.4 million cubic meters), accounting for 17% of the contract value; There are about 137 structures (sand gates, drainage gates), accounting for 27% of the total contract value; 17 kilometers of flood control walls, accounting for 2% of the total contract value; pavement engineering accounted for 7% of the total contract value; other ancillary works accounted for the total contract value 3%. The project is funded by the World Bank and the owner is the Ministry of Water Resources in Bangladesh. The contract period is 42 months.

The Accommodation for F-FDTL China-Aid Project, Timor Leste

The project is economic assistance project of the Ministry of Commerce of China, the project consists of 100 sets of military housing, with a total construction area of 9,000 square meters, and a contract period of 12 months.

CC-86R and CC-94R Metro Rail Projects In Delhi, India

CC-86R light rail project Double-deck light rail maintenance station and related ancillary projects.
CC-94 light rail project design and construction (5.71km viaduct-6 elevator stations-water supply system, sanitation and drainage works).

Construction of Nepal Rastra Bank, Central Office Building, Baluwater, Kathmandu, Nepal

The project consists of office buildings, underground parking lots and canteens, landscapes, internal roads, sidewalks, attached sanitary facilities, pipelines, power engineering, etc. The employer is the Nepal National Reconstruction Authority and the central project management committee. The construction period is 30 months.

Fuling Comprehensive Bonded Port Area

Chongqing Fuling Comprehensive Bonded Zone Phase I Area A infrastructure project is located on the northwest side of Panhua Wharf in Fuling New City, covering an area of about 540 mu, and area B infrastructure project covering an area of about 2,645 mu. The construction content includes bayonet and fence about 8 kilometers, waiting area about 28,000 square meters, office building about 12,500 square meters, quarantine processing area about 3,000 square meters, standard factory buildings and bonded warehouses about 130,300 square meters, and supervision information system, road and pipe network engineering (including: the municipal road is about 1.6 kilometers long, and the road width is 12-22 meters; the road in the area is about 2.4 kilometers long, the road width is 6-15 meters, and the two-way two-lane road). The project started in January 2019 and was completed at the end of October 2019.

Dianchi Baofeng Peninsula Wetland Project

The general contracting project for the design and construction of the Baofeng Peninsula Wetland Construction (Ecological Restoration Phase I) Project in Guandu District is located in Guandu District, Kunming City. The developer is Yunnan Ruicheng Construction Project Management Co., Ltd. The construction scale is 1633.8 acres, of which 706.8 acres will be restored in the Baofeng belt-shaped lakeside wetland area and 927 acres will be upgraded in the Haidong wetland area.

Public Rental Housing Projects in Chongqing

Chongqing International Construction Corporation undertook the construction of 30% public rental housing projects in the downtown of Chongqing, supporting the “People’s Housing Program” in the city, which is the quality and safety demonstration project of housing construction in Chongqing, and has been praised by the Ministry of Housing and Urban-rural Development of the People’s Republic of China. Fusheng Public Rental Housing Project and Airport Jiayuan Public Rental Housing Project have been awarded the “Three Gorges Cup High-quality Structural Project” in Chongqing respectively.

Hulunbuir Museum Project

The Hulunbuir History Museum construction project started in September 2019. The owner is Hulunbuir National Museum, and the acting employer of the is Hulunbuir Urban Construction Investment (Group) Co., Ltd.The project is located in the Sanguanyihu area of Hailar District, Inner Mongolia Autonomous Region, east of the City Planning Pavilion. The total land area of the project is about 46660.49 square meters, and the total construction area is 37886.79 square meters, of which the above-ground construction area is 30902.00 square meters and the underground construction area is 6984.79 square meters. The contract duration is about 26 months.

Jiangjun Road Project in Nanchong, Sichuan, on PPP basis

The general contract for the Jialing River Bridge and Approach Bridge Project (Second Tender Section) of Jiangjun Road, Nanchong City, Binjiang North Road Interchange and Petroleum West Road Reconstruction Project was signed in May 2019, with a total calendar day of 548 days. The developer is Nanchong Shuntong Construction Engineering Management Co., Ltd. The project site is in Shunqing District and Gaoping District of Nanchong City. Jiangjun Road Jialing River Bridge and Approach Bridge Project, Binjiang North Road Interchange and Shiyou East Road Reconstruction Project.

Neijiang TCM Hospital PPP Project

The Neijiang Traditional Chinese Medicine Hospital project has a contract duration of 2 years and a total construction area of approximately 106,900 square meters. Among them, the inpatient complex building (Building No. 3) is about 30,500 square meters, the outpatient medical technology building (Building No. 1) is about 32,100 square meters, and the underground garage (Building No. 5) and civil air defense projects are about 43,600 square meters. (6,800 square meters), other supporting construction area is about 648.46 square meters, the construction of outdoor water supply and drainage, strong and weak electricity, fire protection projects, sewage treatment projects, greening landscape projects, lighting projects, etc., and purchase and purchase of relevant medical service equipment.

Chongqing Cuntan Yangtze River Bridge Project

The Cuntan Yangtze River Bridge has a total length of 1.6km. The main bridge is a twin-tower single-span suspension bridge with a span of 880m, with a design speed of 80km/h, 8 lanes in both directions, and a bridge deck width of 38m.
CICO is the acting employer as the engineering construction agency, and its Chongqing Yongjian Construction Engineering Management Co., Ltd. is responsible for project construction management as a project management company. The total project contract value is 1.48 billion RMB Yuan, of which 1.13 billion yuan is for construction and installation. The project started on December 20, 2012 and was completed for acceptance on December 26, 2017.

Jiangnan Interchange Reconstruction Project

The Jiangnan Interchange Reconstruction Project is located four kilometers away from the Nan'an District of Chongqing City. The scope of reconstruction includes the new construction and reconstruction of the existing Jiangnan Interchange, the existing Haixia Road, the existing Xianghuang Interchange and the surrounding roads and pedestrian crossing facilities, and the construction and reconstruction of the surrounding roads and pedestrian crossing facilities. The project is under construction. After completion, it will further optimize and improve the four kilometers of transportation hardware facilities in Nan'an District.

Chongqing Caixin-Shiguangli Project

The project is located in Panlong Street, Shiping Bridge, Jiulongpo District, Chongqing. The total construction area is 76558.14 square meters, consisting of 2 high-rise residential buildings and commercial buildings. 1# building has 32 floors, frame shear wall structure. Building 2# has 33 floors and is a shear wall structure. 3-1# Commercial has 2 floors; 3-2# Commercial has 2 floors; 3-3# Commercial floor is high-1/2 floor; 3-4# Commercial floor is high-1 floor; Underground garage floor is high-2 floors are shear wall structure. The 1# building project won the 2017 Three Gorges Cup Quality Structural Engineering Award.

Simian Moutain Road and Bridge Project

In 2015, Chongqing Simianshan Tourism Investment Co., Ltd., Chongqing Foreign Construction (Group) Co., Ltd. and Chongqing Daotong Equity Investment Fund Management Co., Ltd. signed the "Infrastructure Construction Financing + EPC Construction General Contract for Simianshan Tourism Resort in Jiangjin District, Chongqing Project Contract. The first phase of the project started on July 22, 2015, the second phase started on February 15, 2016, and the third phase started in mid-December 2016. At present, most of the projects have been completed, and the remaining 3 projects are under construction. The second horizontal line project and the first horizontal line project are being finalized. It is expected to be completed by the end of October 2020 and the handover will be completed in November. The water plant pipeline project is in continuous shutdown due to the owner's irregular procedures and can be completed 3 months after the resumption of work.

Chongqing Sunac-Wanda Cultural and Tourism Town Project

Chongqing Wanda City Investment Co., Ltd. is the general contractor of the A02 and A05 plots of Wanda Cultural Tourism City project.
Plot A02 of Wanda Cultural Tourism City covers an area of 55,000 square meters, with a total construction area of about 340,000 square meters, of which residential area is about 220,000 square meters, underground garage is about 100,000 square meters, and property management and equipment rooms are about 20,000 square meters. This project includes 1-10# high-rise residential buildings, ranging from 26-33 floors. 11-14# is a 3-story commercial building facing the street.
Plot A05 of Chongqing Wanda Cultural Tourism City covers an area of 14,000 square meters, with a total construction area of about 70,000 square meters, of which residential area is about 48,000 square meters, underground garage is about 21,000 square meters, and property management and equipment rooms are about 1,000 square meters. This project includes two high-rise buildings, 1# and 2#, with 33 floors and a building height of about 100 meters.

Wuzhou Century Cultural and Creative Center project

The contractor of the Wuzhou Century Cultural and Creative Center project is Chongqing Guozhou Cultural Industry Co., Ltd. Located at Tanzikou, Jiulongpo District, Chongqing, with Yangjiu Road to the north, municipal roads to be constructed on the west and northwest, open fields on the south, and multi-storey apartments and high-rise residences on the northeast.
The main layout is composed of a three-story underground garage, a three-story podium commercial and theater building and a 21-story office building. The building functions include commercial, office, garage, equipment rooms and other supporting facilities.
The total land area of the project is about 20,115 square meters, and the total construction area is 91462.20 square meters, of which: the above-ground construction area is 52,564.70 square meters and the underground construction area is 38,897.50 square meters. The height of the building above ground is 99.50 meters.